EN  |  中文
eXp Realty The Superior Realty Group Anna Chi Huang 黄安娜房地产 · DRE# 01851808

Sacramento's First 3D-Printed ADU Is Finished: What It Teaches Elk Grove Homeowners About Adding a Backyard Home

By Anna Chi Huang, REALTOR® ·
A quiet, tree-lined residential cul-de-sac in Sacramento with two-story homes, tall pines and green lawns in warm evening light
Photo: Indolences / Wikimedia Commons, public domain, cropped

Every so often a local story comes along that is both heartwarming and genuinely useful for homeowners. This weekend's Sacramento Bee feature on the city's first 3D-printed accessory dwelling unit is one of them. If you've ever wondered whether a backyard home could work on your property, here's what this project shows, and what the rules look like here in Elk Grove.

The story. According to the Bee, a 1,200-square-foot ADU with 2 bedrooms and 2 bathrooms now sits in a backyard in Natomas Park. It was built by K4k Construction, a company run by the homeowners, Estelle and Dave Gonzalez, for Estelle's parents, who moved from Rancho Cordova and had lived in the main house for three years while they waited. The family celebrated with a housewarming on Nov. 14. The home has solar panels, 10-foot ceilings and, according to the builder, a 10-hour fire-resistance rating. The Bee describes it as the first permitted 3D-printed home in Sacramento.

The fast part and the slow part. A large robotic arm printed the concrete walls layer by layer in only 12 days. But the full project took about 3 years. Much of that time went to the subcontractors who handled plumbing, electrical and HVAC, and to the city's permitting process. Because it was the first of its kind, Gonzalez told the Bee, the city basically had to write new housing codes for the project, and it took 18 months to get completely permitted. The neighborhood homeowners association also had a say: the original design was scrapped because the ADU's exterior needed to complement the main house.

That is the part I want every homeowner to hear. With an ADU, the construction is rarely the bottleneck. Design, approvals, utilities and inspections are. A more standard ADU won't face the same first-of-its-kind hurdles, but planning ahead still saves time and money.

Chart of key numbers for Sacramento's first 3D-printed ADU: 1,200 square feet with 2 bedrooms and 2 bathrooms, walls printed in 12 days, 18 months to get fully permitted, and about 3 years from start to finish

What it looks like in Elk Grove. The City of Elk Grove offers three pre-approved plans for detached ADUs: a 435-square-foot studio, a 625-square-foot one-bedroom and a 746-square-foot two-bedroom. The city says using them "allows for an expedited review process, and a lower cost permit process." The trade-off is that the plans must be built exactly as designed, and you still need a site plan for your lot, Title 24 energy documents, planning and zoning approval, and sign-offs from outside agencies.

Bar chart of Elk Grove's three pre-approved detached ADU plans: a 435-square-foot studio, a 625-square-foot one-bedroom, and a 746-square-foot two-bedroom, with a line at 750 square feet marking the city development impact-fee exemption

A few other points from the city's ADU guidance are worth knowing:

  • Detached ADUs can be up to 1,200 square feet.
  • ADUs under 750 square feet are exempt from city development impact fees. For larger ADUs, those fees may apply in proportion to the ADU's size compared with the main house. School district fees, such as Elk Grove Unified's, and other agency fees can still apply.
  • The city checks a submittal for completeness within 48 hours. It asks applicants to allow at least 10 business days for the first plan review and 5 business days for each later review.
  • New detached ADUs generally need solar, which can go on the ADU or the main house.
  • The ADU must be compatible with the main home's architectural style, materials and colors.
  • Both the main house and a regular ADU can be rentals. For a junior ADU, the owner must live in one of the units.
  • If you already have an unpermitted unit, the city says you may be able to get permits to legalize it.
Step-by-step chart of Elk Grove's published ADU permit path: submit online, a completeness check within 48 hours, first plan review of at least 10 business days, each later review of 5 business days, then permit, inspections, and a certificate of occupancy

What this means for sellers and buyers. For sellers, a properly permitted ADU can be a real selling point, because it gives buyers flexibility for loved ones, a home office or rental income. If yours was never permitted, it's better to know that before you list. For buyers, always ask for the permits and the final sign-off on any ADU or garage conversion, and check what the HOA allows before you plan one.

This is also where my background helps. Besides helping clients buy and sell, I own InnovaBuild LLC, a licensed general contracting company, so I can help sellers think through what an improvement is likely to cost and how buyers may see it. If you're wondering whether a backyard unit makes sense for your property, or how an existing one affects your home's value, I'm always happy to talk it through.

Anna Chi Huang, REALTOR® | The Superior Realty Group, brokered by eXp Realty | DRE# 01851808

Source: Sacramento Bee, "Sacramento's first 3D-printed ADU is a family labor of love. 'We're home'" by Hannah Ruhoff, Nov. 21, 2026: https://www.sacbee.com/news/business/real-estate-news/article318085043.html
City of Elk Grove, "Accessory Dwelling Units (ADUs)": https://elkgrove.gov/residential-building-permits/accessory-dwelling-units-adu
City of Elk Grove, "City Pre-Approved ADU Plans and Submittal Requirements": https://elkgrove.gov/accessory-dwelling-units/city-pre-approved-adu-plans-and-submittal-requirements

Anna Chi Huang, REALTOR®
Anna Chi Huang, REALTOR®The Superior Realty Group, brokered by eXp Realty · DRE# 01851808
Serving Elk Grove and the Sacramento region since 2008 · (916) 613-4900